000 | 00582nam a22001937a 4500 | ||
---|---|---|---|
003 | OSt | ||
005 | 20250517123740.0 | ||
008 | 250517b |||||||| |||| 00| 0 eng d | ||
020 | _a9780367685294 | ||
082 |
_a624.0684 _bT253C |
||
100 | _aTengan, Callistus...[et. al.] | ||
245 | _aConstruction project monitoring and evaluation: An integrated approach | ||
260 |
_aLondon: _bRoutledge, _c2021 |
||
300 | _axi, 202 p. | ||
440 | _aRoutledge research collections for construction in developing countries | ||
650 | _aDesign | ||
700 | _aAigbavboa, Clinton | ||
942 | _cBK | ||
999 |
_c16369 _d16369 |